All guides
Guide 01beginner · 15 min
First-week setup guide
Configure Busenkla for a small team in one week.

Goal
Set up a working time-tracking flow in one week without overengineering.
Step 1: Define minimum project structure
Create only active clients and currently staffed projects.
Avoid importing old archives at launch.
Step 2: Choose submission policy
Start with draft-first behavior and require project context at submit stage.
This keeps daily capture friction low.
Step 3: Align review cadence
Set two checkpoints:
- Mid-week quick review.
- End-of-week final review.
Step 4: Define reporting owner
Pick one owner responsible for exporting and sharing final reports.
Step 5: Inspect first weekly close
After week one, adjust only one policy at a time.
Keep the workflow stable while the team builds habit.